Product Detail :
|
Trr {p} 18.00 km of the existing 60 kg s0uts rails lwr laid on psc6 sleepers to me8 density with 60 kg souts rails lwr on psc6 sleepers with elastic fastenings in the section of sse/p. way/rpj & doa under aden/rpj (km. up. line = 279.59 to 286.41, 288.62 to 289.3, 290.50 to 294.00, 300.00 to 303.00, wé4 70 to 305.70) construction of all crit work at mrnd, nlom,olpc, cdg, ahh, umb, raa, okt. ghg, kmno, khrr, kart, krli, mot. rpar, sfm, uhl & nmda in cfw. provision of rgm / track machine sidings under déefferent aden/den over division supply of 4820 cum 65 mm gauge machine crushed stane ballast on section in the section of aden/sml. {i) tpr (p) of 1.693 kms on bridge approaches section under aden/sir bridge no. 93, 148, 164, 179 & 185 on sir-olpc section) & (ii) casual renewal of broken rpc sleeper 3998 nos aver various secbhons of umb divison (under aden bt, pta, rpj, sir » ldh-dui, bri-sgnr, dui-bt, mrnd-dlpc. repair to wheel burns & scabbed rails over division under ssep way/tp under den/track/umb. track works in connection with electronic interlocking at kart, rpar angwn stations on sir-aadr section under aden/sir.
|